AMP MMC-365: Panama Policy on SEEMP, IMO-DCS and Carbon Intensity Indicator
AMP circular setting out the policy and instructions for implementing MARPOL Annex VI requirements on SEEMP, IMO-DCS fuel oil consumption reporting and operational CII ratings, including verification duties delegated to Recognized Organizations and reporting deadlines.
- Issued by
- Panama Maritime Authority
- Number
- MMC-365
- Date
- 1 Jan 2026
- Applies to
- Ships of 5,000 gross tonnage and above for IMO-DCS and CII; ships of 400 gross tonnage and above for SEEMP Part I; specific ship types listed in MARPOL Annex VI regulations 2.2.5 to 2.2.29 for CII rating; excludes non-mechanically propelled ships, FPSO/FSU and drilling rigs
- Refers to
- MARPOL Annex VI regulations 26, 27, 28, Resolution MEPC.328(76), Resolution MEPC.395(82), Resolution MEPC.347(78), Resolution MEPC.352(78), MEPC.1/Circ.905, MEPC.1/Circ.913, Resolution MEPC.385(81)
Key points
- Ships of 5,000 gross tonnage and above shall report aggregated fuel oil consumption data (IMO-DCS) within three months after the end of each calendar year (31 March) to the Recognized Organization or Verifier, and ships in the specified categories shall also calculate and report the Attained Annual Operational CII within the same deadline. (p. 6)
- Recognized Organizations are delegated by AMP to verify SEEMP (including Part III for ships of 5,000 GT and above), verify DCS data compliance, determine the CII rating (A to E), and recommend to AMP the issuance of the Statement of Compliance (SOC-DCS-CII), which is valid for the calendar year of issue, the following year, and the first five months of the subsequent year, and must be kept on board for at least five years. (p. 9)
- Ships rated D for three consecutive years or E for one year shall carry out an additional verification to ensure the SEEMP includes a plan of corrective actions, completed before requesting the SOC and not exceeding one month after reporting the attained annual operational CII. (p. 11)
- Ships of 5,000 GT and above not in the specified CII categories are not subject to CII calculations or SEEMP Part III but must still report DCS data; ships of 400 GT and above only require SEEMP Part I; ships not propelled by mechanical means, FPSO/FSU and drilling rigs are excluded from regulations 27 and 28. (p. 4)
- Ships not early implementing the amendments to Appendix IX (transport work data) shall undergo SEEMP verification to incorporate the new required information before 1 January 2026. (p. 10)
Key points by AI from the PDF, with page numbers. Read the original before acting.
Get new AMP documents in your bell and inbox
SuperRonin keeps your fleet's certificates and surveys, and sends each new circular of your vessels' flag, class and P&I club as one line with a link. Free during the pilot.
More from AMP
- MMC-171: Flag Safety Inspection Program · Nov 2026
- MMC-87: Panama Policy on MODU Code and Offshore Drilling Units · 1 Nov 2026
- MMC-150: MOU Annual Safety Inspection Program · Nov 2026
- MMC-194: Extended service intervals not exceeding 30 months for novel inflatable liferafts · Nov 2026
- MMC-337: Instructions for Payments to CSR and ISSC - - CANCELLED BY MMC-183 · Nov 2026