AMP MMC-345: Ballast Water Management Convention 2004, Panama Policy
AMP circular MMC-345 sets the flag's policy for the Ballast Water Management Convention 2004, detailing D-2 compliance deadlines for BWMS installation, commissioning test verification by ROs, electronic approval of BWMPs and IBWMCs via SEGUMAR 2.0, and the new Ballast Water Record Book format effective 1 February 2025.
- Issued by
- Panama Maritime Authority
- Number
- MMC-345
- Month
- Mar 2026
- Deadline
- 8 Sept 2024
- Applies to
- AMP-registered ships of 400 GT and above and all AMP-registered ships with dedicated ballast water tanks or spaces, including mobile offshore units, FSUs and FPSOs
- Refers to
- Resolution MEPC.300(72), Resolution MEPC.325(75), Resolution MEPC.369(80), Resolution MEPC.127(53), Resolution MEPC.306(73), BWM.2/Circ.70/Rev.1, BWM.2/Circ.42/Rev.2, Resolution A.1156(32)
Key points
- Ships constructed before 8 September 2017 must install a BWMS meeting regulation D-2 at the first renewal IOPP survey completed on or after 8 September 2019, or at the second renewal IOPP survey if the first was completed before that date; ships constructed on or after 8 September 2017 must meet D-2 immediately; oil tankers under 150 GT and other ships under 400 GT constructed before 8 September 2017 must meet D-2 not later than 8 September 2024. (p. 8)
- Delegated ROs must verify at the initial survey that a commissioning test has been conducted to validate the BWMS installation per BWM.2/Circ.70/Rev.1; if indicative analysis is non-complying, a detailed analysis per BWM.2/Circ.42/Rev.2 must be conducted using laboratories accepted by the RO. (p. 10)
- BWMPs must be submitted for approval through the SEGUMAR 2.0 platform available since 17 November 2025 and will be approved electronically by the Administration; the fee is USD 1,500 for first evaluation or significant amendments and USD 500 for amendments due to name, call sign or gross tonnage changes. (p. 11)
- Full-term IBWMCs are issued electronically by the Administration for USD 300 after receiving the interim certificate, survey report and BWMP approval; certificates issued from 1 June 2022 are valid until the expiry date of the Cargo Ship Safety Construction Certificate, not exceeding five years. (p. 14)
- The Ballast Water Record Book must be updated in accordance with Resolution MEPC.369(80) as amended by Appendix II, with formal entry into force on 1 February 2025. (p. 19)
Key points by AI from the PDF, with page numbers. Read the original before acting.
Get new AMP documents in your bell and inbox
SuperRonin keeps your fleet's certificates and surveys, and sends each new circular of your vessels' flag, class and P&I club as one line with a link. Free during the pilot.
More from AMP
- MMC-171: Flag Safety Inspection Program · Nov 2026
- MMC-87: Panama Policy on MODU Code and Offshore Drilling Units · 1 Nov 2026
- MMC-150: MOU Annual Safety Inspection Program · Nov 2026
- MMC-194: Extended service intervals not exceeding 30 months for novel inflatable liferafts · Nov 2026
- MMC-337: Instructions for Payments to CSR and ISSC - - CANCELLED BY MMC-183 · Nov 2026