AMP MMC-302: Maritime Labour Convention, 2006, amended (MLC). Exemption Certificate and Dispensation Letter. Title 3, Regulation 3.1, Standard A3.1 and Part B of the Code, Regarding accommodation and Recreational Facilities
This circular sets the procedure for AMP-registered vessels to obtain an exemption certificate for non-compliance with mandatory MLC Title 3 Part A accommodation standards or a dispensation letter for non-compliance with non-mandatory Part B guidelines, and clarifies that vessels built before the MLC entered into force are exempt only from construction and equipment requirements.
- Issued by
- Panama Maritime Authority
- Number
- MMC-302
- Month
- Aug 2026
- Applies to
- AMP-registered vessels whose construction was terminated or whose keel was laid after August 20th of 2013 and that do not comply with Title 3, Regulation 3.1 standards and/or guidelines; vessels under construction
- Refers to
- Law No. 2 of January 6, 2009, Executive Decree No. 86 of February, 2013, MLC 2006, Article VI, MLC Title 3, Regulation 3.1, Standard A3.1, Part A, MLC Title 3, Part B (Guidelines), Circular MMC-162, SEGUMAR 2.0
Key points
- Ships not complying with mandatory Part A (MLC Title 3, Regulation 3.1, Standard A3.1) must apply for an exemption certificate through the SEGUMAR 2.0 platform. (p. 1)
- Ships not complying with non-mandatory Part B guidelines must request a dispensation letter by email to [email protected]/[email protected] with reasons and the vessel's plan; it is issued without cost. (p. 2)
- Both requests require the patent or navigation statutory certificate, the maritime labour certificate (if applicable), and the two updated financial securities; the exemption certificate also requires the official receipt of payment. (p. 2)
- The exemption certificate number goes in DMLC Part I; the dispensation letter must be attached to the DMLC and the Maritime Labour Certificate and be available to competent authorities. (p. 2)
- Vessels constructed before the MLC entered into force are not subject to construction and equipment requirements, but all other MLC requirements still apply; if a vessel changes name, owner, RO, manager or GT, the exemption certificate is invalid and the process must restart with the 300.00 Dollars payment per MMC-162. (p. 2)
Key points by AI from the PDF, with page numbers. Read the original before acting.
Get new AMP documents in your bell and inbox
SuperRonin keeps your fleet's certificates and surveys, and sends each new circular of your vessels' flag, class and P&I club as one line with a link. Free during the pilot.
More from AMP
- MMC-171: Flag Safety Inspection Program · Nov 2026
- MMC-87: Panama Policy on MODU Code and Offshore Drilling Units · 1 Nov 2026
- MMC-150: MOU Annual Safety Inspection Program · Nov 2026
- MMC-194: Extended service intervals not exceeding 30 months for novel inflatable liferafts · Nov 2026
- MMC-337: Instructions for Payments to CSR and ISSC - - CANCELLED BY MMC-183 · Nov 2026