AMP MMC-250: Lifeboat on-load release and retrieval systems

Merchant Marine Circular MMC-250 on lifeboat on-load release and retrieval systems under amended SOLAS Regulation III/1.5 and LSA Code Chapter IV/4.4.7.6, addressed to ship-owners, operators, Company Security Officers, legal representatives of Panamanian flagged vessels, Panamanian Merchant Marine Consulates and Recognized Organizations.

Issued by
Panama Maritime Authority
Number
MMC-250
Month
Oct 2023
Applies to
All ships constructed on or after 1 July 2014; ships constructed before 1 July 2014 (Existing Ships) fitted with lifeboat on-load release mechanism
Refers to
Resolution MSC.317(89), Resolution MSC.320(89), MSC.1/Circ.1392, MSC.1/Circ.1392/Corr.1, MSC.1/Circ.1584, MSC.1/Circ.1393, SOLAS Regulation III/1.5, LSA Code Chapter IV/4.4.7.6

Overview

  • Applies to: All ships constructed on or after 1 July 2014, and existing ships constructed before 1 July 2014 fitted with lifeboat on-load release mechanisms. (p. 1)
  • Deadline: 1 July 2019 as the latest date for existing ships to meet amended LSA Code 4.4.7.6.4 to 4.4.7.6.6 after the first scheduled dry-docking after 1 July 2014. (p. 2)
  • Deadline: 1 July 2013 as the date before which evaluation and performance test of existing lifeboat on-load release and retrieval systems is referenced. (p. 2)
  • Refers to: Resolution MSC.317(89), Resolution MSC.320(89), MSC.1/Circ.1392, MSC.1/Circ.1392/Corr.1, MSC.1/Circ.1584, MSC.1/Circ.1393, SOLAS Regulation III/1.5, LSA Code Chapter IV/4.4.7.6. (p. 1)

Key points by AI from the PDF, with page numbers. Read the original before acting.

Get new AMP documents in your bell and inbox

SuperRonin keeps your fleet's certificates and surveys, and sends each new circular of your vessels' flag, class and P&I club as one line with a link. Free during the pilot.

More from AMP

All AMP documents · All issuers we follow