LISCR POL-014: Implementation, Survey And Certification Under The International Convention For The Control And Management Of Ship’s Ballast Water And Sediments, 2004 (BWM Convention)..
Revision of the BWM Convention implementation notice updating references to BWM.2/Circ.66/Rev.6 for BWMS approved to MEPC Resolution 279(70) and for calibration of BWMS components, and restating survey, certification, D-2 compliance deadlines, commissioning testing, and port State control inspection requirements.
- Issued by
- Liberia Maritime Authority
- Number
- POL-014
- Date
- 3 Aug 2026
- Deadline
- 8 Sept 2024
- Applies to
- All LISCR-registered ships including those operating under the authority of another Party to the BWM Convention; ships of 400 gross tonnage and above excluding floating platforms, FSUs and FPSOs are subject to surveys and certification.
- Refers to
- Maritime Regulation 2.35, BWM.2/Circ.66/Rev.6, MEPC Resolution 279(70), BWMS Code, BWM.2/Circ.70/Rev.1, MEPC Resolution 252(67), MEPC Resolution 290(71)
Key points
- BWMS installed on ships on or after 28 October 2020 shall be approved in accordance with the BWMS Code; BWMS approved to MEPC Resolution 279(70) and installed prior to 28 October 2020 may remain on board if fully operable, per BWM.2/Circ.66/Rev.6. (p. 13)
- From 1 June 2022, installation and additional surveys must confirm a commissioning test was conducted per BWM.2/Circ.70/Rev.1; if a BWMS undergoes an upgrade or major component change it is treated as newly installed, requiring a new commissioning test and re-issue of the IBWMC. (p. 14)
- BWMS components that take measurements must be calibrated per the manufacturer's instructions and BWM.2/Circ.66, as amended; a calibration certificate must be kept on board and only the manufacturer or authorized persons may perform accuracy checks. (p. 16)
- Existing ships must meet the D-2 standard at the first IOPP renewal survey on or after 8 September 2017 if completed on or after 8 September 2019, otherwise at the second such renewal; ships under 400 GT (and oil tankers under 150 GT) built before 8 September 2017 must comply by 8 September 2024. (p. 8)
- Ships may be subject to a four-stage port State control inspection per MEPC Resolution 252(67); during the experience building phase a ship shall not be penalized solely for a D-2 exceedance if the BWMS is approved, correctly installed, the BWM Plan is followed, the system is maintained, and self-monitoring indicates proper operation or the port State was advised of a defect; if non-compliance is found, corrective action is required and the IBWMC is withdrawn if not corrected. (p. 24)
Key points by AI from the PDF, with page numbers. Read the original before acting.
Earlier and later documents
- Replaces Marine Notice POL-014, dated 05/25
Get new LISCR documents in your bell and inbox
SuperRonin keeps your fleet's certificates and surveys, and sends each new circular of your vessels' flag, class and P&I club as one line with a link. Free during the pilot.
More from LISCR
- Marine Security Bulletin 48/2026: Unauthorized Boarding in Gulf of Aden · 18 Nov 2026
- Marine Security Bulletin 47/2026: Vessel attack in the Arabian Gulf · 17 Nov 2026
- Marine Security Bulletin 46/2026: Vessel attacks in the Strait of Hormuz · 13 Nov 2026
- SAF-020: New SOLAS regulation II-1/3-13 on Lifting appliances and Anchor Handling Winches · 12 Nov 2026
- Marine Advisory 26/2026: Compliance with Amendments of 2022 to Maritime Labour Convention, 2006, as amended (MLC, 2006) · 12 Nov 2026