LISCR Marine Advisory 22/2024: Port of Dampier, Australia - Bridge Wing Shelters for the Protection of Pilots and Crew

LISCR Marine Advisory 22/2024 relays the Port of Dampier Harbour Master's new mandatory requirements for bridge wing shelters on large bulk carriers and gas tankers calling at the port from 1 September 2024, including dimensional specifications, acceptance of Panama Canal compliant shelters, and the requirement to notify the Harbour Master if unable to comply.

Issued by
Liberia Maritime Authority
Number
Marine Advisory 22/2024
Date
2 Aug 2024
In force from
1 Sept 2024
Applies to
Bulk/cargo vessels of 81,000 DWT or more and Gas Tankers of 60,000m3 capacity or more calling at Port of Dampier, Australia; recommended for vessels of less than 81,000 DWT and Gas Tankers of less than 60,000 m3
Refers to
Port of Dampier Marine Notice D17/2024, Panama Canal Authority OP Notice to Shipping N-1-2022

Key points

  • From 1 September 2024, all bulk/cargo vessels of 81,000 DWT or more and Gas Tankers of 60,000m3 capacity or more must provide bridge wing shelters that meet the requirements of the Local Marine Notice for the protection of Pilots and the bridge team; it is recommended that vessels of less than 81,000 DWT and Gas Tankers of less than 60,000 m3 also comply. (p. 1)
  • The bridge wing shelter must be made of suitable material to provide shade from the sun, extend at least 1.52m inboard from the outer edge of the bridge wing, have a fore-and-aft dimension at least from the forward part to the aft part of the bridge wing, be at least 2.45 m high from deck level, be of strong construction to withstand winds that can be encountered, prevent spilling water inside the frame of the shelter during rain, and allow unrestricted visibility from the bridge wing; shelters can be portable or removable. (p. 1)
  • Bridge Wing Shelters which comply with the requirements of Panama Canal Authority OP Notice to Shipping N-1-2022 are acceptable for the purpose of this Local Marine Notice. (p. 1)
  • Vessel owners/operators shall risk assess the assembling/disassembling works for these shelters to safeguard the crew from unidentified risks; the Harbor Master office will not approve the design or risk assessment for bridge wing shelters. (p. 2)
  • Vessels unable to comply with the above requirement must notify the Harbor Master immediately; the Marine team will evaluate each vessel on a case-by-case basis. (p. 2)

Key points by AI from the PDF, with page numbers. Read the original before acting.

Get new LISCR documents in your bell and inbox

SuperRonin keeps your fleet's certificates and surveys, and sends each new circular of your vessels' flag, class and P&I club as one line with a link. Free during the pilot.

More from LISCR

All LISCR documents · All issuers we follow